An Adnan Feroz Group company
Our companies

Why it matters

Less landfill. Less coal. One plant does both.

Waste that would be buried becomes a product with a buyer. The buyer burns less fossil fuel. The same tonne of material does both jobs.

Waste side
Landfill diverted
Fuel side
Coal replaced
Both sides
Emissions reduced
Capacity
7,500 tonnes a day
  1. 01

    Waste side

    Landfill diverted

    Mixed municipal waste stops being a cost to bury and becomes feedstock. Every tonne processed is a tonne that does not go into the ground.

    A city pays to collect and bury its waste. Once a plant stands between collection and landfill, the same tonne becomes the first input of a process with a product at the end of it. At the designed capacity, that is 7,500 tonnes a day that enters the plant rather than the ground.

  2. 02

    Fuel side

    Coal replaced

    Refuse derived fuel can replace part of the coal used in cement kilns, which run hot enough to use it cleanly and continuously.

    Cement kilns burn large volumes of coal at very high temperatures. Those temperatures are what make refuse derived fuel usable in them: the fuel burns cleanly and the kiln runs continuously. Every tonne of fuel supplied displaces part of a tonne of coal the kiln would otherwise buy.

  3. 03

    Both sides

    Emissions reduced

    Less landfill methane from decomposing waste and less fossil fuel burned at the kiln, from the same tonne of material.

    Waste that decomposes in landfill releases methane. Coal burned at the kiln releases fossil carbon. One tonne of municipal waste processed into fuel reduces both at once, which is why the concept addresses a waste problem and a fuel problem with one plant.

Who it matters to

Four parties, one plant

The city
Less waste buried. A municipal partnership is in development and not yet signed.
The kiln
A fuel with a known energy value that replaces part of its coal. Off takers join under supply agreements.
The operator
A plant to design, build and run at 7,500 tonnes a day. The four stages are the operating brief.
The funder
A waste management project of about USD 500M, structured through the group's capital advisory arm. The funding seat is open.

The AERC concept summary

One page: what the consortium is, the four-stage process, the designed capacity, the project size, what is signed and what is sought. For funders, operators, off takers and technology partners deciding whether to take the call.

  • Designed capacity of 7,500 tonnes of municipal waste a day, project size about USD 500M
  • The four stages from mixed waste to refuse derived fuel with a known energy value
  • Status: consortium agreements signed, company in registration, municipal partnership in development
  • The four seats open and what each partner receives under NDA

One email with the summary. No return figures, no projections, no follow-up you did not ask for.

Partner with AERC

Funders, operators, off takers and technology partners. Two questions, then your details. The concept summary follows, and the consortium brief under NDA.

1 of 3

How would you like to be involved?

Pick the seat that fits. It decides which brief you receive.